LA FORMULE DRL
Know-how based on experience
Case Study #3: Direct Damage – Material theft
INSURED RISK: Construction site
QUANTUM : 72 000 $
THE FACTS / THE INQUIRY:
We carried out a careful verification of the damages claimed and of the site documentation, which enabled us to conduct tight interviews with the subcontractors.
THE RESULTS:
We objectively demonstrated swelling of the claim. Based on our recommendation, a settlement of 60% less than the amounts claimed was reached.
The insurer’s position will not be contested by the insured subcontractor considering the undeniable facts that we have gathered.